home Wisetrip project  
HOME PROJECT RESULTS MEDIA CENTRE LINKS CONSORTIUM NEWS & EVENTS PRIVATE SECTION

 

WISETRIP

Achievements and main Findings

RESULTS

WISETRIP in operation

 

WISETRIP Kick-off meeting

Heraklion (GR), February 12th – 13th 2008.

 

All WISETRIP Consortium members met together and made an overview of the project structure and activities. A six-month work plan was released at the end of the meeting. Roles and responsibilities have been distributed among partners according to the official WISETRIP Application Form approved by the Commission.

 

WISETRIP First results

Starting on February 2008, the consortium has been involved in the identification of the users requirements, the reviews of the existing journey planners and a first development of the core WISETRIP Journey Planner architecture and of its interfaces with the participating Journey Planners.

The activities have been organised and monitored through two technical meetings and two project meetings, along with a good project management structure.

Related to the above activities, the Consortium has released the first project outputs, that consists in Deliverable D2.1 “Report on the Analysis of Requirements” and Deliverable D2.2 “WISETRIP Architecture & Data Model”.

In the meantime, an External User Group (EUG) including 27 members from 7 EU countries (Greece, Italy, UK, Finland, Belgium, Denmark, Germany) and Australia, China and USA has been identified for monitoring and evaluating the project activities and results and, not at least, for supporting the validation phase of the WISETRIP Platform. EUG members belong to different categories of the potential users of WISETRIP services and data providers: citizen, Public Authorities, transport operators, service providers, service developers, Universities, research organisation, Union of transport operators, Network of intelligent transport, Industry Association, Airport, Port.

 

WISETRIP technical meetings

 

1st: Florence (IT) March 18th 2008 focusing on JPs investigation analysis.

WP2 partners involved in the investigation analysis of JPs have launched a survey to find out the Institutional, Organizational, Operational and Technical issues of existing JPs. During the meeting the partners could discuss the survey results and the approach to be followed for the next WP2 actions.

 

2nd: Aberdeen (GB) July 10th – 11th 2008 focusing on Architecture design

After an introduction of the final results of the Journey Planners survey and literature review, the lead partner chaired the session on functional analysis and architecture design discussing from one side the core system architecture and personalisation of WISETRIP and on the other side the external systems to be interconnected by WISETRIP.

 

WISETRIP 3rd project meeting

Helsinki (FI) October 15th – 16th 2008

Presentation of Architecture Design and D2.2 contents (led by Forthnet). Detailed discussion on WP3 - Journey Planner core system development - and allocation of Tasks work for beneficiary partners (led by MOBISOFT). Presentation of WP4 on Personalisation System Design and Development (led by ETRA). The second day focussed on WP6 on Integration, Validation and Demonstration followed by presentation of the draft Evaluation Plan (led by AUEB). The meeting was finalised with the overview of dissemination activities (led by ATAF).

 

WISETRIP 4th project meeting

Cologne (DE) February 5th – 6th   2009

Focusing on WP3 and WP4 progress and initial reports for the later stages deliverables. Partners also discussed WP6 activities and a draft Evaluation Plan was presented. The meeting was finalised with the overview of dissemination activities.

 

WISETRIP 5th project meeting

Valencia (ESP) July 1st – 2nd 2009

Presentation of the implemented Core System and RTDM. Detailed discussion on the WP5 – Information Distribution System Design & Development. The second day focused on WP6 on Integration, Validation and Demonstration followed by presentation of the basic principles that will possess within the Demonstration Plan. The meeting was finalized with the overview of dissemination activities.

 

 

DOCUMENTS
 TitleAreaLast Updated
WISETRIP Brochure WP723/05/2008
Deliverable D2.1 - Analysis of Requirements WP211/09/2009
Deliverable D2.2 - Architecture & Data Model WP211/09/2009
Deliverable D6.1 - Evaluation Plan WP601/03/2010
Deliverable D7.1 - Wisetrip Dissemination Package_1st WP726/02/2010